With over 17 years of experience in trade
licensing, Contractor School Online (CSO) is your primary resource
to help you pass your state contractor license exam! We offer
online practice tests, study materials, books and more.
To become a certified contractor in Hawaii, you must pass a
Business, Law and Management exam. Depending on the trade you
are interested in, you may also be required to pass a trade
exam as well. Please use our
Information Request Form
to find out more.
Contractor School Online (CSO) will assist you with their
professional consultants and provide study materials, also
practice tests
for the Business, Law, and Management and trade
if available.
If purchases are made elsewhere make sure the correct
author, title and year are appropriate for the trade.
CSO Business
and Law Practice Test coincides with the required
State Contractor’s Manual.
Please note: Inventory Pricing, Contractors State Bonding
and Subjects may change without notice.
STATE OF HAWAII
($75) Content
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($67.98)
-
Business, Law and Management Manual
|
|
($95) Content
-
Framing, Millwork, Cabinets, Finish & Rough Carpentry Online Practice Test
-
3 Months Access
|
|
($95) Content
-
Electrical Online Practice Test
-
3 Months Access
|
|
($95) Content
-
General Building Contractor Online Practice Test
-
3 Months Access
|
|
($95)
Content
-
Low Voltage Online Practice Test
-
3 Months Access, Available 24/7
|
|
($95)
Content
-
Carpentry, Remodeling, Repairs, Cabinet & Millwork Online Practice Test
-
3 Months Access, Available 24/7
|
|
($95)
Content
-
Heating and Air Conditioning Online Practice Test
-
3 Months Access, Available 24/7
|
|
($95)
Content
-
Plumbing Online Practice Test
-
3 Months Access, Available 24/7
|
|
($132.98)
-
Business, Law and Management Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
($220)
-
General Building Contractor Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
($160)
-
General Building Contractor Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($220)
-
Carpentry, Remodeling, Repairs, Cabinet & Millwork Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
($160)
-
Carpentry, Remodeling, Repairs, Cabinet & Millwork Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($220.98)
-
Low Voltage Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
($160)
-
Low Voltage Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($220.98)
-
Framing, Millwork, Cabinets, Finish & Rough Carpentry Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
($160)
-
Framing, Millwork, Cabinets, Finish & Rough Carpentry Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($220.98)
-
Electrical Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
($160)
-
Electrical Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($160)
-
Heating and Air Conditioning Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($150)
-
Plumbing Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
|
|
($210.98)
-
Plumbing Online Practice Test
-
Business, Law and Management Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
($150)
-
Plumbing Online Practice Test
-
3 Months Access
-
Business, Law and Management Manual
|
|
Contractor License Classifications, Summary and Exams
State Board Contractor Examination Information
Important: candidate must pass exam(s) within six months
from the date your application is approved by the Board.
Contractor School Online (CSO) will assist you with their professional
consultants and provide study materials, also
practice testsfor the Business, Law and Management
and Trade if available.
If purchases are made elsewhere make sure the correct author,
title and year are appropriate for the trade. CSO Business and
Law Practice Test coincides with the required State Contractor’s
Manual.
The following trade classifications require examinations:
A - General Engineering>
B - General Building
C-1 Acoustical and Insulation
C-2 Mechanical Insulation
C-3 Asphalt Paving
C-3a Asphalt Concrete Patching, Sealing and Striping
C-4 Boiler, Hot-Water Heating and Steam Fitting
C-5 Cabinet, Millwork and Carpentry Remodeling and Repairs
C-5b Siding Application
C-6 Carpentry Framing
C-7 Carpet Laying
C-9 Cesspool
C-12 Drywall
C-13 Electrical
C-14 Sign
C-15 Electronic Systems
C-15a Fire and Burglar Alarm
C-15b Telecommunications
C-16 Elevator
C-16a Conveyor Systems
C-17 Excavating, Grading and Trenching
C-20 Fire Protection
C-20a Dry Chemical Fire Repressant Systems
C-21 Flooring
C-22 Glazing
C-23 Gunite
C-27 Landscaping
C-27b Tree Trimming and Removal
C-31 Masonry
C-31a Cement Concrete
C-31b Stone Masonry
C-32 Ornamental, Guardrail and Fencing
C-33 Painting and Decorating
C-35 Pile Driving, Pile and Caisson Drilling, and Foundation
C-36 Plastering
C-37 Plumbing
C-37b Irrigation and Lawn Sprinkler Systems
C-40 Refrigeration
C-41 Reinforcing Steel
C-42 Roofing
C-42b Wood Shingles and Shakes
C-42d Composition Shingle
C-43 Sewer, Sewage Disposal, Drain and Pipe Laying
C-43a Reconditioning and Repairing Pipelines
C-44 Sheet Metal
C-48 Structural Steel
C-49 Swimming Pool
C-49a Swimming Pool Service
C-51 Tile (Ceramic and Mosaic)
C-52 Ventilating and Air Conditioning
C-55 Waterproofing
C-56 Welding
C-57 Well Drilling
C-60 Solar Power Systems
C-61 Solar Energy Systems
C-62 Pole and Line
C-63 High Voltage Electrical
Special consideration ADA accommodation
If you require testing accommodations under the Americans with
Disabilities Act (ADA), please call the Board to obtain an accommodation
request form the testing center. This form must be submitted,
along with written professional verification of your disability,
before you schedule your exam. Reasonable testing accommodations
are provided to allow candidates with documented disabilities
recognized under the ADA an opportunity to demonstrate their
skills and knowledge.
Contractor exams are administered only in English. If
you have difficulty reading English, you may use an interpreter
to help you read and understand the exam items. The fee for
this service is $100 in addition to your exam fee. If you think
you need to use an interpreter, you must: 'request this
service from the testing center using an Interpreter Request
Form. ' Use a certified interpreter or a person employed by
a recognized interpreter agency. If your interpreter is not
certified, the interpreter must be approved by the Board. 'Choose
an interpreter who has no construction skills and no
knowledge of the subject matter being tested.' Call the Board
to obtain an affidavit of compliance form that needs to be turned
in with the registration form.
Every applicant for a contractor’s license must pass both a
Business, Law and Management
(Part I)
exam and a Trade-Specific
(Part II)
exam, if available. Scroll down the page and the content
outline for the Business, Law
and Management Exam and content outlines for
the Trade-Specific exams.
Scroll down the page for
Sample Questions. There are a few examples
of the type of questions that may be included in the Business,
Law and Management Exam below.
Contractor School Online will assist you with our professional
consultants and assist you for the study materials,
practice
testsfor the Business, Law and Management andy trade
if available.
Please note: Inventory and pricing subject to change without
notice.
The study program contains three elements: Contractor’s Manual.
This manual is the primary resource for the Hawaii Business,
Law and Management Exam. The manual covers critical subject
areas, including: contracts, labor laws, financial management,
tax laws, marketing, licensing and estimating. It also offers:
Federal Employer’s Tax Guide (Circular E); Fair Labor Standards
Act; Hawaii Mechanic’s Lien Laws; Hawaii Licensing Rules and
Regulations; Hawaii À9 Preparing for your exam.
'If you are taking an open-book exam (check the exam-specific
content outline), the approved references that are allowed during
the exam will be provided to you at the test center.
No other reference materials, papers or study materials are
allowed at the test center.
A score of 75 percent or above is required to pass each exam.
The testing center reports exam results to the Board. To ensure
confidentiality, scores will not be disclosed over the
phone or passing score. The Board mails scores and additional
licensing information to candidates who pass the exam(s). Retake
information. If you do not pass the exam, you will receive a
score report approximately 10 business days after your exam
date.
Contractor Examinations
All test questions are in a multiple-choice format, with one
correct answer and three incorrect options. Some questions may
refer to a figure-drawing, table or chart in the exam booklet.
Some questions may require simple arithmetic calculations. Each
exam is taken in an allotted amount of time that will be announced
before the exam. Scores are based on the number of questions
answered correctly.
Contractor Business and Law Exam
This content outline lists all subjects covered in the Business
and Law exam and the percentage of questions asked about each
topic.
Scope –
Tests a candidate’s knowledge of payroll taxes, Workers’ Compensation,
Unemployment Compensation, lien laws, and other laws and subjects
that will affect their daily operations as contractors.
Closed Book
80 Questions - Three-hour time limit
75% Correct required to pass
Exam Topic %
Business Organization 3
Licensing 10
Estimating and Bidding 12
Contract Management 18
Project Management 9
Public Works Laws 5
Risk Management 10
Safety 7
Labor Laws 7
Financial Management 9
Tax Laws 6
Lien Law 4
References
-
Contractor’s Manual
-
Contractor’s Study Guide
State Business and Law Sample Questions
The following samples are from the Testing Center and may be
useful to review for the type of questions that may be included
in the Business and Law exam.
1.
Given: A contracting business has a balance sheet on December
31 that indicates
Current Assets of $100,000
Current Liabilities of $75,000
Fixed Assets of $250,000
Long Term Liabilities of $150,000
The contracting business has what Net Working Capital on December
31?
A $ 25,000
B $100,000
C $125,000
D $350,000
2.
What term identifies the financial report that shows the profit
or loss as the difference between the income received and the
expenses paid out during a period?
A Balance sheet
B Statement of worth
C Income statement
D Financial statement
Answers to sample questions: 1-A; 2-C.
Testing Center Exam Content Outlines
Trade-Specific Exams
Trade exams are not available for every specialty classification.
However, if an exam has been prepared for a classification for
which you wish to be licensed, you will be required to take
and pass it. The trade exams may contain questions on reading
and interpreting construction codes and regulations, knowledge
of building codes, trade materials, tools, equipment and methods.
A content outline and reference list for each trade exam is
available below.
Each outline will provide you with information about the number
of questions on the exam, the amount of time you have to complete
the exam, the subject areas that will be covered in the exam,
and whether the exam is open book or closed book. The following
trade classifications require examinations:
Exam Titles
A - General Engineering
Scope –
The exam covers the broad range of activities performed by a
General Engineering Contractor as defined in Title 16, Chapter
77 of the “Hawaii Administrative Rules.” Examination questions
are based on research of the accepted business and trade practices
as determined by surveying current professionals in the field
of General Engineering.
Examination Outline
Bridges/Miscellaneous Structures 15
Planning/Surveying 14
Earthwork 15
Utilities 13
Heavy Equipment 9
Canals, Reservoirs and Flood Control 10
Asphalt Pavement 6
Concrete Pavement 6
Estimating/Basis of Payment 5
Metal Barriers, Striping, Signs and Fences 3
Safety - OSHA 4
References
The following references were used to create exam questions
but are not allowedin the testing center.
1.
Federal Regulations
2.
Specifications for Road and Bridge
3.
Concrete Mixtures,
4.
Excavation and Grading
B - General Building
Scope:
The exam covers the broad range of activities performed by a
General Building Contractor as defined in Title 16, Chapter
77 of the Hawaii Administrative Rules. Examination questions
are based on research of accepted business and trade practices
as determined by surveyed current professionals in the field
of General Building.
Examination Outline
Closed Book
80 Questions - Four-hour time limit
75% Correct required to pass
Exam Topic %
Plan Reading and Estimating 8
Sitework 7
Concrete 12
Masonry 8
Metals 5
Carpentry 18
Thermal and Moisture Protection 15
Doors and Windows 8
Finishes 12
Safety 8
References
The following references were used to create exam questions
but are not allowedin the testing center.
1.
Federal Regulations
2.
International Building Code
3.
Carpentry and Building
4.
Control of Concrete Mixtures
5.
Excavation and Grading
6.
Masonry
7.
Roofing and Waterproofing
8.
Painting and Decorating
9.
Reinforcing Bars
C-1 Acoustical and Insulation
Scope:
To install acoustic tile systems, spray systems, and insulation
in buildings and structures for the purpose of sound control.
These systems or materials may be installed independently of
or in conjunction with acoustic tile and/or drywall systems
as multi-purpose (acoustic, insulation, fire retardant) systems.
Examination Outline
Closed-Book
25 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Residential installation 16
Insulation materials 32
Commercial installation 16
Sound control 16
Safety 12
Estimating/planning 8
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Safety and Health
2.
Uniform Building Code
3.
Carpentry and Building
4.
Carpentry
5. Installation of Residential
6. Insulation in Commercial
C-2 Mechanical Insulation
Scope
– To install insulation materials on mechanical systems for
the purpose of temperature control.
Examination Outline
Closed-Book
40 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Duct insulation 15
Hot, chilled, and steam pipe insulation 11
General insulation requirements 9
Safety 5
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Mechanical Code
2.
Safety and Health
3.
Commercial and Industrial Insulation
C-3 Asphalt Paving
Scope:
To proportion, mix, and place base materials, and to place paving
and surfacing consisting of graded mineral aggregates bonded
with asphalt or bituminous materials so that a firm, smooth
surface suitable for roadways, runways, driveways, parking areas,
and play areas is obtained, including the application of seal
coating and parking lot striping.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Asphalt pavements and treatments 40
Earthwork 22
Planning/surveying 15
Heavy equipment/safety 15
Estimating/basis of payment 8
References
The following references have been used to create exam questions
but are not allowedin the testing center:
Primary References:
1.
Asphalt in Pavement
2.
Excavation and Grading
3.
Hot-Mix Asphalt Paving
4.
Heavy Construction
C-3a - Asphalt Concrete Patching, Sealing and Striping
Scope:
To proportion, mix, and place base materials, and to place paving
and surfacing consisting of graded mineral aggregates bonded
with asphalt or bituminous materials so that a firm, smooth
surface suitable for roadways, runways, driveways, parking areas,
and play areas is obtained, including the application of seal
coating and parking lot striping.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Asphalt pavements and treatments 40
Earthwork 22
Planning/surveying 15
Heavy equipment/safety 15
Estimating/basis of payment 8
References
The following references have been used to create exam questions
but are not allowedin the testing center.
Primary References:
1.
Pavement Maintenance
2.
Excavation and Grading
3.
Hot-Mix Asphalt Paving
4.
Heavy Construction
Secondary References:
1. Safety and Health
2.
Specifications for Road, Bridge, and Public Works
3.
Highway Materials, Soils, and Concretes
4.
Moving the Earth
5.
Uniform Traffic Control Devices
6.
Heavy Construction
7.
Public Works
C-4 Boiler, Hot-Water Heating and Steam Fitting
Scope:
To install and repair fire-tube and water-tube power boilers
and hot-water heating boilers, and thermal fluid systems including
all fitting and piping, valves, gauges, pumps, radiators, convectors,
fuel oil tanks, fuel
oil lines, chimneys, flues, heat insulation, and all other
devices, to include pipe insulation connected with boiler installation
and repair.
Examination Outline
Closed-Book
60 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percent
Steam and hot water boilers 25
Fuel oil and gas piping 15
Steam piping 20
Insulation 10
Chimneys and flues 12
Sizing and estimating 10
Inspection and testing 8
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Boiler and Pressure Vessel Code
2.
Boiler and Pressure Vessel Code
3.
High Pressure Boilers
4.
Low Pressure Boilers
5.
Mechanical Code
C-5 Cabinet, Millwork and Carpentry Remodeling and Repairs
Scope:
To install cabinet, case, sash, door, trim, nonbearing partitions,
and to remodel or to make repairs to existing buildings or structures,
or both, and to do any other work which would be incidental
and supplemental to the remodeling or repairing. The repairs,
carpentry work, or remodeling shall include the installation
of garage doors, bifold, and shutter doors, and the installation
of manufactured sidings and any other work that would not involve
changes or additions to the building’s or structure’s basic
components such as, but not limited to, foundations, beams,
rafters, joists, or any load bearing members or sections.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Cabinetry and millwork 35
Doors, windows, and stairs 20
Associated trades 12
Estimating/tools 13
Rough carpentry 10
Siding 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Carpentry and Building
2.
Building Code
3.
Carpentry
4.
Cabinetmaking
5.
Safety and Health
C-5b Siding Application
Scope:
To prepare surfaces and install aluminum vinyl or other manufactured
siding, with the exception of wood, so that a watertight surface
is obtained.
Examination Outline
Closed-Book
25 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Vinyl siding 32
Surface preparation/planning 28
Tools, equipment, and safety 16
Aluminum siding 12
Plans, specifications, and estimating 12
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Vinyl Siding
2.
Building Code
3.
Carpentry
4.
Carpentry and Building
5.
Safety and Health
C-6 Carpentry Framing
Scope:
A C-6 Carpentry Framing Contractor is authorized to do framing,
siding, wood truss, roof sheathing, and other work as is by
custom and usage accepted in the construction industry as carpentry
framing.
Examination Outline
Closed-Book
60 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Walls 15
Floors/stairs 14
Roofs 11
Estimating/plans 9
Layout 8
Metal framing 3
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Carpentry and Building
2.
Building Code
3.
Safety and Health
4.
Carpentry
5.
Gypsum Construction
6.
Dictionary
C-7 Carpet Laying
Scope:
To apply or install acceptable fabric floor coverings or artificial
turf to surfaces.
Examination Outline
Closed-Book
30 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Sheet carpet 36
General knowledge 27
Surface preparation 20
Carpet cushion 7
Carpet accessories 7
Adhesive 3
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Guide for Installation of Residential Textile Floor Covering.
2.
Installation of Commercial Carpet.
C-9 Cesspool
Scope:
To excavate cesspools and install septic tanks
in compliance with the requirements of the department of health.
Examination Outline
Closed-Book
25 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Cesspools 20
Septic tanks 32
Drainage fields 36
Excavation 12
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Plumbing Code
2.
Administrative Rules
of Health
3.
Plumbing
C-12 Drywall
Scope:
A C-12 Drywall Contractor lays out and installs all types of
gypsum wallboard systems including the taping and texturing
operations incidental thereto. Also included is the application
of spray on barriers which would be incidental to the installation
of wallboard.
Examination Outline
Closed-Book
25 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Installation 44
Taping and texturing 20
Materials
C-13 Electrical
Scope:
To place, install, erect, or connect any electrical wires, fixtures,
appliances, apparatus, electrical signs, conduits, poles, raceways,
and to do trenching, backfilling, patching, and surface restoration
in connection with the installation of conduit and lines that
transmit, transform, or utilize electrical energy less than
600 volts phase to phase. This classification also includes
the work of the C-15 Electronic Systems Contractor and C-60
Solar Power Systems Contractor.
Examination Outline
Open Book
40 Questions - Two-hour time limit
75% Correct required to pass
Exam Topic %
General Electrical Knowledge 22
Grounding and Bonding 13
Services, Feeders, and Branch Circuits 10
Raceways and Enclosures 10
Conductors and Cables 10
Motors and Controls 10
Equipment for General Use 10
Special Occupancies and Equipment 10
Low Voltage Circuits 5
References
The following reference is providedin the testing
center for your use during the exam. No highlighting or notes
of any sort may be made in the book during the exam.
1.
Electrical Code
The following references were used to create exam questions
but are not allowedin the testing center.
1.
Current Fundamentals
2.
Textbook of Electricity
C-14 Sign
Scope:
To fabricate, install electrical or non-electrical signs, sign
devices for the purpose of display, advertising, directions,
install all sign supports and sign accessories.
Examination Outline
Closed-Book
40 Questions – Three-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Materials 15
Clearances and installation 15
Electrical 15
Signs 13
Sizing and estimating 12
Fabrication and layout 12
Anchorage and fasteners 10
Safety 8
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Sign Code
2.
Electric Code
3.
Building Code
4.
Reinforcing Bars
C-15 Electronic Systems
Scope:
To install electronic equipment and electronic controls, including
but not limited to, public address, intercommunication, master
antenna, and music distribution systems, CATV systems, master
and program clock systems, electronic teaching devices, and
other systems including electric door opening devices, and fire
and burglar alarm systems; provided that this shall not include
the installation of any conduits thereto.
Examination Outline
Open Book
28 Questions - One-hour time limit
75% Correct required to pass
Exam Topic %
General Electrical Knowledge 13
Grounding and Bonding 3
Branch Circuits 3
Raceways and Enclosures 3
Conductors and Cables 10
Equipment for General Use 3
Special Occupancies 3
Low Voltage Circuits 13
Intrusion Detection and Alarm Systems 10
Fire Detection and Alarm Systems 10
Communications Systems 10
Sound and Video Systems 10
References
The following references are providedin the testing
center for your use during the exam. No highlighting or notes
of any sort may be made in these books during the exam.
1.
Electrical Code
2.
Fire Alarm Code
C-15a Fire and Burglar Alarm
Scope:
To install electronic equipment and electronic controls, including
but not limited to, public address, intercommunication, master
antenna, and music distribution systems, CATV systems, master
and program clock systems, electronic teaching devices, and
other systems including electric door opening devices, and fire
and burglar alarm systems; provided that this shall not include
the installation of any conduits thereto.
Examination Outline
Open Book
28 Questions - One-hour time limit
75% Correct required to pass
Exam Topic %
General Electrical Knowledge 13
Grounding and Bonding 3
Branch Circuits 3
Raceways and Enclosures 3
Conductors and Cables 10
Equipment for General Use 3
Special Occupancies 3
Low Voltage Circuits 13
Intrusion Detection and Alarm Systems 10
Fire Detection and Alarm Systems 10
Communications Systems 10
Sound and Video Systems 10
References
The following references are providedin the testing
center for your use during the exam. No highlighting or notes
of any sort may be made in these books during the exam.
1. Electrical Code
2. Fire Alarm Code
C-15b Telecommunications
Scope:
To install, maintain, and repair telephone, computer, and data
systems; including the associated cabling, wiring, or fiber
optics, provided that this shall not include the installation
of any conduits thereto.
Examination Outline
Open Book
50 Questions - Two-hour time limit
75% Correct required to pass
Exam Topic %
General Electrical Knowledge 10
Wiring and Protection 20
Wiring Methods and Materials 20
Equipment for General Use 5
Special Occupancies 5
Special Conditions 5
Communication Systems 35
References
The following reference
is provided
in the testing center for your use during the exam. No highlighting
or notes of any sort may be made in the book during the exam.
1.
Electrical Code
The following references were used to create exam questions
but
are not allowed
in the testing center.
1.
Textbook of Electricity
2.
Telecommunications Wiring
C-16 Elevator
Scope:
C-16 Elevator Contractor assembles, installs
and maintains sheave beams, motors, sheaves, cable and wire
rope, guide, cab, counterweight, door assemblies, hydraulic
systems, automatic and manual control systems, signal systems,
and all other devices, apparatus, and equipment for the safe
and efficient installation and operation of electrical, hydraulic,
and manually operated elevators, dumb waiters, moving walks
or ramps, conveyor systems, stage lifts, escalators, and man
lifts, excluding any lift or conveyor used in constructing a
building or structure.
Examination Outline
Closed-Book
80 Questions – 2 1/2-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Suspension 10
Grounding and handicap 10
Clearance, space and load limits 10
Controls 10
Electricity 10
Hydraulic systems 10
Escalators and moving walks 10
Test and inspect 10
Sizing and estimating 10
Drives 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Electrical
and Fire Protection
2.
Safety for Elevators and Escalators,
3.
Inspector for Elevators and Escalators
4.
Code for Existing Elevators and Escalators
5.
Administrative Rules
6.
Revised Statutes
C-16a Conveyor Systems
Scope:
To install belt line, conveyor systems, including installation
of baggage carousels.
Examination Outline
Closed-Book
30 Questions – Three-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Drives 15
Guides and rollers 10
Aprons and skiriting 10
Belts 10
Carousels 15
Frames, stands, and guards 10
Controls and safety devices 10
Test and inspect 10
Sizing and estimating 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Safety of Elevators and Escalators
2.
Safety Conveyors and Related Equipment
3. ASME/ANSI
4.
Conveyor Technical Book
5. Materials-handling catalog
C-17 Excavating, Grading and Trenching
Scope:
To dig, move, and place earthen material for a cut, fill, grade,
or trench, including the use of explosives in connection therewith.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject area percentage
Equipment/technique 33
Compaction 20
Soil types and stability 18
Estimating 17
Retaining walls 5
Blasting 5
Shoring 2
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Excavation and Grading
2.
Surveying Practice
3.
Carpentry and Building
4.
Earth Moving
5.
Building Code
6.
Safety and Health
7.
Principles of Heavy Construction
C-20 Fire Protection
Scope:
To lay-out and install approved types of fire prevention and
protective systems, including all mechanical apparatus, devices,
piping, and equipment appurtenant thereto. The licensee shall
comply with applicable provisions of the Fire Underwriters (NBFU)
to meet all requirements of the local authorities having jurisdiction.
Examination Outline
Closed-Book
60 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Sprinkler systems 50
Wet/dry chemical systems 20
Water supply, storage and distribution 10
General code/trade knowledge 10
Flammable storage 5
Commercial kitchen equipment 5
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1. NFPA 11, 13 and more.
C-20a Dry Chemical Fire Repressant Systems
Scope:
To install tanks, piping, sprinkler heads in kitchens and range
hoods.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Halon systems 25
Foam systems 25
Dry chemical systems 20
Fire extinguishers 10
Carbon dioxide systems 10
Restaurant equipment 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Fire Code
2. Fire Protection
3. Portable Fire Extinguishers
4. Low Expansion Foam and Combined Agent Systems
5. Medium and High Expansion Foam Systems
6. Carbon Dioxide Extinguishing Systems
7. Halogenated Fire Extinguishing
8. Agent Systems
9. Halogenated Extinguishing Agent Systems
10. Dry Chemical Systems
C-21 Flooring
Scope:
To apply or install floor covering material such as linoleum,
rubber, vinyl, cork, asphalt, plastic aluminates, or other materials
that are by custom and usage accepted in the construction industry
as composition flooring, including the installation of wood
floor covering and also to include floor sanding and refinishing
of floor surfaces.
Examination Outline
Closed-Book
30 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Wood strip flooring 30
Resilient flooring 25
Surface preparation 25
Finishing 10
Parquet 5
Sanding 5
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Carpentry and Building
2.
Finishing Hardwood Flooring
3.
Installing Hardwood Flooring
C-22 Glazing
Scope
– To glaze or tint frames, panels, sash and doors and to assemble
and install window wall and curtain wall, shower doors, tub
enclosures, mirrors, metal windows and screens metal sliding
doors, metal jalousies, store front metal and trim, plastics,
tempered glass doors; including items as frames and hardware
and any allied products not stipulated above but affiliated
with the glass and glazing industry.
Examination Outline
Closed-Book
50 Questions – 2-1/2 hour time limit
75% Correct Required to Pass
Subject Area Percentage
Installation techniques 20
Skylights 14
Physical properties of glazing material 12
Manufacturing standards 12
Construction tolerances 10
Occupant protection 8
Safety and employee protection 8
Glass films and shading 6
Glass sealing techniques 6
Glass insulation 4
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Building Code
2.
Glazing
3.
Materials of Construction
4.
Safety and Health
5.
Construction Materials and Processes
C-23 Gunite
Scope:
To pneumatically apply aggregates, cement, water as gunite and
finish the surface; this includes the setting of ground wires
and pencil rods to establish the finished surface planes.
Examination Outline
Closed-Book
20 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Forming reinforcement and placement 50
Tools and equipment 30
Materials 20
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Gunite and Shotcrete
2.
Safety and Health
C-27 Landscaping
Scope:
To prepare plots of land for architectural horticulture and
to provide decorative treatment and arrangement of gardens,
lawns, shrubs, vines, bushes, trees, and other decorative vegetation;
construct conservatories, hot and green houses, drainage and
sprinkler systems, all types of rock spacing and ornamental
pools, fountains, ornamental walls, fences, and walks; and placement
of hydro mulching for ground cover and for containment of soil,
to include installation of irrigation control electrical wiring
that will carry 24 volts or less.
Examination Outline
Closed-Book
50 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Irrigation systems 11
Trees and shrubs 9
Grass and groundcover 8
Grading and drainage 7
Soils and amendments 5
Hardscaping 7
Low voltage electricity 3
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Turf Irrigation
2.
Landscape Operations
3.
Building Fences of Wood, Stone, Metal, and Plants.
4.
Landscaping
5.
Earth Moving
C-27b Tree Trimming and Removal
Scope:
To prune, trim, and remove trees, including stumps, and restore
ground to condition similar to adjacent area. This does not
include relocation and planting of field grown trees.
Examination Outline
Closed-Book
20 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Tree pruning and trimming 45
Tree cutting and stump removal 30
Tool, equipment, and safety 25
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Landscaping
2.
Safety and Health
3.
Landscape Management, Methods, and Materials
C-31 Masonry
Scope:
A masonry contractor is authorized to lay brick and other baked
clay products, rough or cast stone, marble, granite, or any
decorative plaster, cut and dressed stone, artificial stone
and brick veneer, CMU, and structural glass brick or block,
laid with or without mortar or adhesives, manufactured precast
concrete facing and back-up panels and brick or block panel,
installation of fire clay products and re-fractories, installation
of grout, rubble work, caulking, tuck pointing, sandblasting,
mortar, washing, and cleaning related to masonry construction,
to place and finish cement concrete, and to drill, saw, and
core concrete.
Examination Outline
Closed-Book
60 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Mortar, grout and concrete 25
Unit masonry 25
Layout and planning 10
Concrete placing and finishing 10
Tools, equipment and safety 10
Plans, specifications and estimating 10
Masonry and concrete accessories 5
Concrete formwork 5
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Building Code
2.
Masonry
3.
Masonry Skills
4.
Concrete
5.
Safety and Health
6.
Concrete Mixtures
7.
Carpentry and Building
8.
Concrete and Estimating
C-31a Cement Concrete
Scope:
A cement concrete contractor is authorized to mix aggregates,
cement, and water in order to make acceptable concrete; to place
and finish concrete including the setting of screeds and forms.
Examination Outline
Closed-Boo
k
70 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Formwork 15
Reinforcing steel 14
Pour, place, and cure 14
Batching 12
Estimating/plans and specifications 9
Layout/excavation 6
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Carpentry and Building
2.
Concrete Mixtures
3.
Building Code
4.
Reinforcing Bars
5.
Safety and Health
6.
Concrete and Estimating
7.
Heavy Construction
C-31b Stone Masonry
Scope:
To construct ornamental walls, veneer walls, and structural
walls or columns from marble, granite, or any decorative plaster,
stone, artificial stone, rough or cast stone, or veneer stone;
to lay stone in a manner that an acceptable paved surface is
obtained and to construct stone retaining walls with or without
mortar, in conformance with building code requirements.
Examination Outline
Closed-Book
25 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Mortar, grout and reinforcing 28
Stone characteristics 28
Stone masonry construction 24
Tools and equipment 20
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Building Code
2.
Masonry
3.
Safety and Health
4.
Landscape
5.
Carpentry and Building
C-32 Ornamental, Guardrail and Fencing
Scope:
Installation of all types of structural and nonstructural units
for residential, commercial, and industrial construction, both
interior and exterior including, but not limited to, folding
gates, guardrails, handrails, stairs, fencing and gates, window
shutters and grills, room dividers and shields, accessories,
railings, and traffic safety devices.
Examination Outline
Closed-Book
30 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Metal fencing 23
Metal working techniques 27
Layout 20
Terminology and materials 17
Safety 13
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Building Fences of Wood, Stone, Metal, and Plants.
2.
Sheet Metal
3.
Welding
4.
Fences and Retaining Walls.
5. OSHA
C-33 Painting and Decorating
Scope:
To apply materials common to the painting and decorating industry
for protective and decorative purposes, including highway and
parking striping by the use of, but not limited to, emulsions,
waxes, water repellents, epoxies, polyesters, urethane, liquid-glass,
fibrous, cement, and rubber base coatings. Surface preparation
of all types, caulking, sandblasting, waterblasting, power cleaning,
or steam cleaning preparatory to painting. Installation of wall
surface covering, decorative texturing, taping and finishing
of drywall.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Application 22
Materials 32
Tools and equipment 12
Safety 10
Surface preparation 8
Estimating 8
Wall coverings 8
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Painting and Decorating
2.
Safety and Health
C-35 Pile Driving, Pile, Caisson Drilling, and Foundation
Scope:
To drill holes for pilings and caissons and to drive piles and
set caissons including cutting piles and capping to compact
earth for foundations by vibrafloat or similar systems.
Examination Outline
Closed-Book
50 Questions – Three-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Miscellaneous engineering-pile driving 60
Concrete 16
Safety-marine 12
General knowledge 12
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Safety and Health
2.
Construction Planning, Equipment and Methods
3.
Concrete Mixtures
4.
Specification for Ready Mixed Concrete
C-36 Plastering
Scope:
To apply gypsum plaster, cement, and acoustical plaster or any
combination of materials common to the plastering industry to
any surface which offers either a mechanical or suction type
bond by spray or trowel and to apply lath or any other material
that will provide a bond for the plaster including spray on,
multipurpose, acoustic, insulation, and fire retardant systems.
Examination Outline
Closed-Book
30 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Installation 6
Tools 6
Materials 5
E.I.F.S. 5
Surface preparation 5
Estimating/plans 3
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Building Code
2.
Safety and Health
4.
Exterior Insulation and Finish Systems
5.
Cement Plaster (Stucco)
C-37 Plumbing
Scope:
To install, repair, or alter complete plumbing systems which
shall include supply water piping systems, waste water piping
systems, fuel gas piping systems, and other fluid piping systems;
the equipment, instrumentation, non-electric controls, and the
fixture for these systems and the venting for waste water piping
systems and fuel gas piping systems; for any purpose in connection
with the use and occupancy of buildings, structures, works,
and premises where people or animals live, work, and assemble;
including piping for vacuum, air, and medical gas systems, spas
and swimming pools, lawn sprinkler systems, irrigation systems,
sewer lines and related sewer disposal work performed within
property lines, fire protection sprinkler systems when supervised
by licensed mechanical engineers or licensed fire protection
contractors, and solar hot water heating systems, and the trenching,
back filling, patching, and surface restoration in connection
therewith.
Examination Outline
Closed Book
80 Questions - Three-hour time limit
75% Correct required to pass
Exam Topic %
Water supply and distribution 25
Drain, waste and venting 25
Size and estimating 15
Fuel and medical gas 13
Fixtures and Trim 6
Excavation 6
Building Sewers 10
References
The following references were used to create exam questions
but are not allowedin the testing center.
1.
Federal Regulations
2.
Mathematics for Plumbers and Pipefitters
3.
Plumbing
C-37b Irrigation and Lawn Sprinkler Systems
Scope:
Irrigation and lawn sprinkler systems contractor. To install
all piping and fittings, pressure regulators, back flow prevention
devices, and irrigation control electrical wiring that will
carry 24 volts or less, as required to provide irrigation systems
for, but not limited to lawns, parks, playgrounds, highway right
of ways, golf courses, and school facilities, including installation
of automatic or manual controls in relation to an irrigation
system.
Examination Outline
Closed-Book
28 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Piping and valves 40
Sprinkler layout 30
Controls and wiring 15
Sprinkler heads 10
Excavation 5
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Turf Irrigation
2.
Water Efficient Landscape
3.
Plumber’s Book
4.
Mathematics for Plumbers and Pipefitters.
5.
Electrical Code
C-40 Refrigeration
Scope:
To assemble and install devices, machinery, and units, including
temperature insulation units, ducts, blowers, registers, humidity,
and thermostatic controls for the control of air temperature
below fifty degrees Fahrenheit in refrigerators, refrigerated
rooms, and insulated refrigerated spaces and to construct walk-in
refrigerator boxes.
Examination Outline
Closed-Book
80 Questions – Three-hour time limit
75% Correct Required to Pass
Subject area # of Questions
Refrigeration fundamentals 20
Commercial refrigeration 16
Controls 16
Sizing and estimating 8
Test and inspection 8
Walk-in box construction 4
Ventilation 4
Troubleshooting 4
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Mechanical Code
2.
Refrigeration and Air Conditioning
C-41 Reinforcing Steel
Scope:
To fabricate, place, tie steel reinforcing bar (rods), of any
profile, perimeter, or cross-section, that are or may be used
to reinforce concrete buildings and structures.
Examination Outline
Closed-Book
50 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Tools and materials 22
Purpose and location 14
Placement 14
Safety 12
Splices 12
Plan reading 10
Bar supports 8
Estimating 8
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Building Code
2.
Placing Reinforcing Bars
3.
OSHA
C-42 Roofing
Scope:
To install a watertight covering to roof surface by use of,
but not limited to, cedar, cement, asbestos, metal, and composition
shingles, wood shakes, cement and clay tile, built-up roofing,
single ply, fluid type of roofing systems, and other acceptable
roofing materials including spray urethane foam, asphalt, and
application of protective or reflective roof, or both, and deck
coatings.
Examination Outline
Closed-Book
50 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Low slope roofing 12
Asphalt shingles 11
Wood shingles and shakes 7
Hard tile shingles 6
Components 6
Surface preparation 5
Estimating/plans and specifications 3
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Carpentry and Building Construction
2.
NRCA Roofing and Waterproofing
3.
Building Code
4.
Safety and Health
C-42b Wood Shingles and Shakes
Scope:
Application of shingles and shakes made of wood or any other
material.
Examination Outline
Closed-Book
30 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Installation requirements 30
Roofing components 25
Surface preparation and planning 20
Plans, specifications and estimating 15
Safety and employee protection 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Roofing and Waterproofing
2.
Roofing Construction and Estimating
3.
Building Code
4.
Safety and Health
C-42d Composition Shingle
Scope
– Application of shingles and shakes made of wood or any other
material.
Examination Outline
Closed-Book
30 Questions – Two-hour time limit
75% Correct Required to Pass
Subject area percentage
Installation requirements 33
Surface preparation and planning 22
Roofing components 19
Plans, specifications and estimating 15
Safety and employee protection 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Roofing and Waterproofing
2.
Roofing Construction and Estimating
3.
Building Code
4.
Safety and Health
C-43 Sewer, Sewage Disposal, Drain and Pipe Laying
Scope:
To construct concrete and masonry sewers, packaged sewer disposal
plants, sewage lift stations, septic tanks, and appurtenances
thereto and to lay steel, cast iron, concrete, vitreous and
non-vitreous, plastic, and any other type of piping for storm
drains, water, and gas lines, irrigation and sewers, manholes
in connection with above work, and repairing and recondition
of the pipelines, including the excavation, grading, trenching,
backfilling, paving, and surfacing in connection therewith.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Excavation and backfill 32
Water piping systems 20
Sewer and storm water systems 15
Septic systems 10
Safety 10
Gas piping systems 8
Paving 5
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Safety and Health
2. Occupational Safety and Health
3.
Construction of Urban Stormwater
4.
Excavation and Grading
5.
Specifications for Road, Bridge, and Public Works
6.
Hot-Mix Asphalt
7.
Heavy Construction
8.
Pipe and Excavation
9.
PVC Pipe, Design and Installation
C-43a Reconditioning and Repairing Pipelines
Scope:
To repair or recondition water and sewer lines manually or by
remote control in conformity with county sewer or with water
supply departments specifications.
Examination Outline
Closed-Book
50 Questions – Three-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Underground utilities-ductile pipe
Installation 30
Underground utilities-clay pipe installation 20
Underground utilities-concrete pipe
Installation 14
Miscellaneous engineering-cut sheet
Calculations 12
Excavating and grading 10
General knowledge 8
Safety-code of federal regulations 6
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Safety and Health
2.
Clay Pipe Engineering
3.
Clay Pipe Installation
4.
Ductile Iron Pipe,
Ductile Iron Pipe
5.
Installation of Ductile Iron Water
6.
Concrete Pipe Installation
7.
Excavation and Grading
8.
Sanitary and Storm Sewers,
Water Environment
C-44 Sheet Metal
Scope:
To fabricate, assemble and install cornices, flashings, gutters,
downspouts, kitchen and laboratory equipment, duct work, metal
flues, and to install pre-manufactured sheet metal products
such as metal chutes, lockers, shelving, louvers, nonbearing
metal partitions, and other sheet metal items common to the
trade, and facsimile items such as plastic skylights, fiberglass
ducts and fittings, including installation of aluminum awnings,
canopies, patio covers, and seamless aluminum gutters.
Examination Outline
Closed-Book
80 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
General duct system knowledge 18
Duct system components 16
Metal ducts 15
Flues and vents 15
Gutters and downspouts 4
Pre-manufactured metal products 4
Welding and cutting 4
Awnings, skylights, and canopies 4
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Mechanical Code
2. HVAC
Duct Construction
3.
Sheet Metal
4.
Building Trades and Blueprint Reading
5.
Sheet Metal
C-48 Structural Steel
Scope:
To fabricate and erect structural steel shapes, bars, rods,
and plates of any profile, perimeter, or cross-section, that
are or may be used as structural members for buildings and structures,
including riveting, bolting, welding, and rigging in connection
therewith. Erection of prefabricated metal buildings, passenger
loading bridges, metal roofing and metal siding installed on
steel framing, and overhead, sliding and roll-up steel doors
or mechanical doors.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Materials 28
Rigging 27
Steel erection 25
Welding 20
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Steel Construction
2.
Safety and Health
3.
Structural Steel Building Frames
4.
Heavy Construction
5.
Construction Materials and Processes
6.
Rigging
7.
Materials of Construction
C-49 Swimming Pool
Scope:
To construct and repair concrete, gunite, metal, or plastic
type pools, whirlpool baths, hot tubs, Jacuzzis, pool decks,
and walkways including, but not limited to, installation and
repair of water and gas service lines, from closest point of
service to pool equipment, pool piping, fittings, back flow
prevention devices, pumps, heaters, chlorine dispensers, electric
pool lights, pool plastering and other types of interior finishing
and sealing, ceramic tile, coping, swimming pool accessories
and safety devices, fences for protective purposes if in original
contract, and excavation and grading in connection with swimming
pool construction.
Examination Outline
Closed-Book
50 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Calculations/estimating/sizing 26
Filtration systems 15
Water treatment systems 14
Installation of pools and spas 12
Equipment piping/testing 9
Fuel gas piping/heaters 9
Electrical 6
Circulation systems 5
Fencing 4
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Swimming Pools, Spa and Hot Tub Code
2.
Specifications for Road, Bridge, and Public Works
3.
Residential Inground Swimming Pools
4.
Pool/Spa Operators
5.
Cement Plaster (Stucco) Book
6.
Shotcrete
7.
Electrical
8.
Building
9.
Plumbing
C-49a Swimming Pool Service
Scope:
Repair and replacement of swimming pools, whirlpool bath, and
Jacuzzi pumps, filters, heaters and related circulation piping,
acid washing, or repainting of swimming pool, whirlpool bath,
and Jacuzzi interiors, repairs to pool tile, coping stones,
plaster, and decks.
Examination Outline
Closed-Book
30 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Pool/equipment repair 40
Water treatment/equipment 26
Circulation systems 14
Filtration systems 10
Heaters 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Swimming Pool, Spa and Hot Tub
2.
Pool/Spa Operators
3.
Cement Plaster (Stucco)
C-51 Tile (Ceramic and Mosaic)
Scope:
A person holding this license may prepare the base upon which
ceramic, mosaic, granite, terrazzo, and other tile work, including
all pseudo tile and marble or cultured marble products, will
adhere by suction, fasteners, or by adhesives. The license holder
may also install these products.
Examination Outline
Closed-Book
40 Questions – Two-hour time limit
75% Correct Required to Pass
Subject area percentage
Installation 35
Materials 30
Tools 15
Surface preparation 10
Estimating 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Setting Tile,
Updated Edition
2.
Ceramic Tile Installation
3.
Installation of Ceramic Tile
4.
Ceramic Tile Field Report
C-52 Ventilating and Air Conditioning
Scope:
To fabricate, assemble, and install warm-air heating and air
cooling systems including heating and cooling solar systems,
complete ventilating systems and complete air conditioning systems
including, but not limited to, piping, controls (other than
electrical), instrumentation, building automation, energy management,
and trenching, backfilling, patching, and surface restoration
in connection with the installation of the air conditioning
systems, and including installation of thermal and acoustical
insulation necessary to maintain heat, or sound, or both, within
the system.
Examination Outline
Closed-Book
80 Questions – Three-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Warm air systems 12
Air conditioning systems 12
Ventilation systems 12
Gas and refrigerant piping 12
Controls 8
Insulation 8
General estimating 8
Solar systems 8
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Mechanical Code
2.
Solar Energy Code
3.
Refrigeration and Air Conditioning
4.
Commercial and Industrial Insulation
C-55 Waterproofing
Scope:
To apply felt, glass, asphaltum, epoxy, pitch, silicone, elastomeric
coatings, sheet membranes or any other materials or combination
of materials to surfaces to prevent water and water vapor from
penetrating and passing the materials. Work shall include, but
not be limited to waterproofing exterior walls and between slabs,
both above and below grade, planter boxes, tank linings and
application of tank coatings, and application to parking decks,
play courts, and walking decks to form a watertight, nonskid
surface, but not to include the work of the C-42 roofing contractor.
Examination Outline
Closed-Book
25 Questions – Two-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Above-grade waterproofing systems 40
Below-grade waterproofing systems 30
Vapor barriers 10
Dampproofing 10
Safety 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Waterproofing the Building
2.
Safety and Health
3. Occupational Safety
C-56 Welding
Scope:
On site job layout, cut, assemble and weld the metal products
including, but not limited to, pipe lines, tanks, pressure vessels,
guard rails, and fire escapes, by welding techniques using carbon
arc, metal arc, submerged arc, flux core, resistance, and oxyacetylene
processes.
Examination Outline
Closed-Book
50 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
Materials 20
Oxyacetylene welding 20
Welding mig/tig/arc 20
Brazing 10
Testing and inspection 10
Blueprint reading 10
Pipe welds 10
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Welding
2.
Welding Fundamentals
3.
Sheet Metal Shop Practices
4.
Welding
C-57 Well Drilling
Scope:
To bore, drill, excavate, case, cement, clean, and repair water
wells; and to install injection wells, water well pumps, pump
controls, concrete pump base and waterline to adjacent storage
tank.
Examination Outline
Closed-Book
24 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area Percentage
General knowledge 24
Well geology 18
Excavation and location 14
Pumps and piping 14
Casings and screens 12
Yield and abandonment 12
Water quality 6
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Groundwater and Wells
2.
Well Construction and Pump Installation
3.
Mathematics for Plumbers and Pipefitters
4.
Plumbing Code
C-60 Solar Power Systems
Scope:
To assemble, install photovoltaic panels, batteries, controls,
and related low voltage.
Examination Outline
Open Book
50 Questions - Two-hour time limit
75% Correct required to pass
Exam Topic %
General Electrical Knowledge 10
Wiring Methods and Materials 20
Special Conditions 20
Solar Photovoltaic Systems 50
References
The following reference is providedin the testing
center for your use during the exam. No highlighting or notes
of any sort may be made in the book during the exam.
1.
Electrical Code
The following reference was used to create exam questions but
is not allowed
in the testing center.
1.
Textbook of Electricity
C-61 Solar Energy Systems
Scope:
To assemble, install solar hot water systems in residential
and commercial buildings and swimming pools. Install solar heating,
cooling systems in residential, commercial, and industrial buildings.
Examination Outline
Closed-Book
25 Questions – One-hour time limit
75% Correct Required to Pass
Subject Area # of Questions
Piping/materials/methods 7
System design/estimating and sizing 7
Pumps and storage systems 4
Collector 4
System controls 3
References
The following references have been used to create exam questions
but are not allowedin the testing center:
1.
Solar Engineering
2.
Refrigeration and Air Conditioning
3.
Solar Energy Code
4.
Solar Water and Pool Heating Design and Installation
5.
Solar Domestic Hot Water Systems
6.
Plumbing
7.
Energy and Water Conservation
C-62 Pole and Line
Scope:
To dress, ground, anchor, and erect poles that will carry high
voltage (600 volts phase to phase or more) electrical wires;
and to connect and string electrical wires, fixtures, and apparatus
to and between the poles, including installation of pole mounted
transformers. Work shall include street and highway lighting
and traffic signal systems, and the work of the C-63 high voltage
electrical contractor.
Examination Outline
Open Book
50 Questions - Two-hour time limit
75% Correct required to pass
Exam Topic %
Electrical Supply Stations 10
Distribution Lines 18
Poles and Supporting Structures 14
Transformers 14
Grounding and Bonding 10
Underground Systems 12
Roadway Lighting and Signal Systems 12
Safety 10
References
The following references are providedin the testing
center for your use during the exam. No highlighting or notes
of any sort may be made in these books during the exam.
1.
Electrical Code
2.
Electrical Safety Code
The following reference was used to create exam questions but
is not allowed
in the testing center.
1.
Lineman’s and Cableman’s Book
C-63 High Voltage Electrical
Scope:
To dress, ground, anchor, and erect poles that will carry high
voltage (600 volts phase to phase or more) electrical wires;
and to connect and string electrical wires, fixtures, and apparatus
to and between the poles, including installation of pole mounted
transformers. Work shall include street and highway lighting
and traffic signal systems, and the work of the C-63 high voltage
electrical contractor.
Examination Outline
Open Book
50 Questions - Two-hour time limit
75% Correct required to pass
Exam Topic %
Electrical Supply Stations 10
Distribution Lines 18
Poles and Supporting Structures 14
Transformers 14
Grounding and Bonding 10
Underground Systems 12
Roadway Lighting and Signal Systems 12
Safety 10
References
The following references are providedin the testing
center for your use during the exam. No highlighting or notes
of any sort may be made in these books during the exam.
1.
Electrical Code
2.
Electrical Safety Code
The following reference was used to create exam questions but
is not allowed
in the testing center.
-
Lineman’s and Cableman’s Book
Candidates need to study the below reference materials to prepare
to take the Business and Law Examination.
Many trades must pass the Business and Law Exam.
Contractor’s Manual
Contractor’s Study Guide
Trade-Specific Exams
Trade exams are not available for every specialty classification.
However, if an exam has been prepared for a classification for
which you wish to be licensed, you will be required to take
and pass it. The trade exams may contain questions on reading
and interpreting construction codes and regulations, knowledge
of building codes, trade materials, tools, equipment and methods.
A content outline and reference list for each trade exam is
available at Contractor
School Online or State.
Each outline will provide you with information about the number
of questions on the exam, the amount of time you have to complete
the exam, the subject areas that will be covered in the exam,
and whether the exam is open book or closed book.
Contractor School Online will assist you with our professional
consultants and assist you for the study materials,
practice testsfor the Business, Law and Management
and trade if available.
If you purchase elsewhere make sure the correct author, title
and year are appropriate for the trade.
Please note: Inventory and pricing subject to change without